Last week updates
Down the lift
Wiring final set up
Superior upsweep mufflers installed, rippled wheel cover from Kevin Baas (Baas Metal Craft) on rear. Hummer tank and ignition switch are in place
When the bikes where outside I could clean up the shack and meanwhile took good care of the carb and fitted up the oil lines
Getting close. Few details to finish such as the rear tail/stop light, gas wire, fuel line, brake wire at the front
I'm off for a few days. Will try to get to fire it up soon. Can't wait!
No comments:
Post a Comment